成人抖阴

Royal Victoria Hospital - Non-Clinical Building

GQ6C0146
GQ6C0135
GQ6C9951
GQ6C0109
GQ6C0098
GQ6C0042
GQ6C9964
GQ6C0033
GQ6C0004
GQ6C0011
GQ6C0149
GQ6C9993

Royal Victoria Hospital - Non-Clinical Building

 

The Non Clinical Support Building (NCSB) is one of a number of enabling and construction projects deisgned to rationalise the RVH Estate to provide a footprint for the proposed new Royal  Belfast Hospital for Sick Children.  The site of the proposed new Non Clinical Support Building will occupy the site of the original Estates Office Building which was demolished in the spring of 2016.

The Non Clinical Support Building will provide a new Receipt and Distribution Centre to support the New Children’s Hospital. It will also facilitate an extension of the underground service tunnels at Level 0 for the delivery of goods and waste management along with new  accommodation for Estates Services.

All photos credited to Rory Moore Photography

 

The site of the new Non Clinical Support Building occupies the site of the original Estates Office Building which was demolished in the spring of 2016.

The new NCSB comprises a 3 storey building with, a rectangular level ‘0’, and the upper levels in a reversed L shaped configuration with the long axis in a generally northerly direction. There is a large service area to the south of the building for the delivery and removal of hospital linen etc., and for refuse skips. This area is accessed from the estate lower service road.

KEY FEATURES

Each level contains the following:

Level 0 – This floor, accessed from the lower levels and main service yard area contains:

  • Staff facilities - Offices, lockers, toilets
  • HV Plant rooms, comms room, mechanical plantroom, LV Switch room
  • Workshops – Joinery, mechanical and electrical, welding
  • PALS storage areas, clean / dirty goods storage, service corridors, tug storage

Level 1 – This floor is primarily office accommodation, is accessed from Spine road and via a separate Level 1 entrance, comprising:

  • Control room, management offices, equipment room IT Hub
  • Toilets, meeting rooms, open plan offices

Level 2 – accessed via lift or stairs from level 1 comprises;

  • Open plan offices, meeting rooms
  • Staff facilities, toilets, staff rest area

Level 3 – A rooftop plantroom, accessed from common stair cores and service lifts, is primarily the plantroom and comprises:

  • Storage areas for hard copy documentation
  • AHU Filters store
  • M&E Plantroom,
  • Rooftop Solar Panels

Back

Keep me updated

Stay connected, please enter your details for updates and latest info


 

Fill in the form below and we will contact you as soon as possible.






Tick if you would like to receive information regarding products, services, news and promotions from 成人抖阴. We won't share your details with other companies. For more information about how we store your data view our privacy policy.
Tel:
02830261134